2-1
CHAPTER 2
OPERATING PROCEDURES
SECTION I
PREPARATION FOR USE AND INSTALLATION
2.1 PREPARATION FOR USE
2.1.1 Unpacking the Equipment
. Before unpacking the
equipment, verify that all major components are present.
Check the AN/PEQ-2A to ensure the following additional
items are included:
a. Battery Caps (2)
b. Safety Block
c. Remote Jack Plug
d. Aim Neutral Density Lens Cap
e. Illuminator Diffuser Lens Cap
f. Mounting Thumbscrew and Washer
If any of the major components or items listed above are
missing, seek guidance from the equipment issuing
authority.
2.1.2 Inspection of the Equipment
. Before use, inspect all
pieces of equipment for any damage such as cracks, loose
parts, faulty cables, or other visible defects. If any damage
or defects are noted, seek guidance from the equipment
issuing authority.